RCCanada - Canada Radio Controlled Hobby Forum - Reply to Topic
RCCanada - Canada's Radio Control Hobby Forum
Clubs, RC Tracks, Events & Bashing meets Radio Control Clubs in Canada Radio Control Offroad & Onroad Tracks. RC Car Races, Events & RC Bashing Chat

Thread: Barn Yard 2011 dirt indoor off-road Reply to Thread
Title:
  
Message:

Additional Options
Miscellaneous Options

Topic Review (Newest First)
11-08-2010 06:20 PM
fuzz86 Ok lots more doen this past weekend.

we will be out working on the track again Saturday.

The outdoor track and indoor will be open for practice Saturday for $10.
Limited pit space do to construction. Some delays on the indoor track may happen do to work being done.

Outdoors bring your Nitro relectric and Baja`s

Here are 2 4x4 slashes. Many more improvements have been done since the video!!

11-02-2010 08:20 PM
fuzz86 The track will be open for work play o Saturday the 6th. after 12:00pm

It still needs work but we want to do some running as well to work the track in.

Oh yah electric only no Baja`s LOL

No web site At this point. I`m not that advanced Yet LOL.
11-02-2010 05:13 PM
motoman1313
Track open for Practice?

Hello,
I was just wondering if the track is goignt o be open on Saturday or Sunday November 6th and 7th.
Also is there a website for the track where I could also find this information.
Thanks,
11-02-2010 07:52 AM
fuzz86 Ok so no one can ever say the track is too small!!!!


Yep I did that!!! Click on the picture (its a video)

10-27-2010 05:00 AM
fuzz86 OK so the track is 90% complete. I want to get some running on it to test out some different vehicles. So this Saturday if you are a available to come out from 1pm to 5pm to run come on out. Cost will Be $10.

I will be out earlier in the morning working on the building if you want to come help out that would be great too.

Electricity is limited so bring your power packs or maybe charge off your cars for now. Benches and recepticals are in the works.

Post up if your coming or PM me so I have a idea. also what your running.
10-22-2010 06:36 AM
bobf24 The drawing in the first post is to scale and has dimensions on it, its about 40' wide by around 43' long, the straight actually will end up around 45' to 50' ish after landing the big Tripple on the left and running around to the infeild, the plan is to put a big bank at the one turn on the far right turn so guys can carry straight away speed around into the in feild if they choose to,

aside from that all lanes are pretty much all 6 - 8 feet wide depending where they are, so lots of room for all scales up to 8th, there should be more pics later tonight or tomorrow so check back,
10-22-2010 04:40 AM
Jamie James What are the dimensions? ?? x ?? feet
10-21-2010 07:32 PM
imported_SELWA Coming along very nicely!!
10-19-2010 09:16 PM
fuzz86 Spank your Monkey guys Its almost there!!!

Al the clay is in and we have a full day of work planned for this week and wil have the packer in so It should be all but done.
10-18-2010 08:49 AM
bobf24 should also mention that the big wood post at the end of the rythym section is being replaced by a smaller steel one and one of the big steel posts at the end of the big table top is being replaced with the smaller steel one and moved towards the back wall so they wont block vision hardly at all,

I can't wait !!!!
This thread has more than 10 replies. Click here to review the whole thread.


All times are GMT -5. The time now is 03:09 AM.


vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.